Data center removal, start to finish.

Single cabinet to full-site decommissions for colocation, hyperscale and edge, planned around your maintenance windows so the work fits your operations.

  • Serialized tracking until close-out
  • On-site drive destruction
  • Multi-phase scheduling
  • Buyback on resellable gear
Technician removing equipment from a server rack during a data center removal
Reconciliation reportSample project
  • Servers186/186
  • Network devices42/42
  • Drives destroyed744/744
  • Racks removed18/18
Every serial number accounted for

R2v3 certified downstream handling, as well as ISO 14001 and ISO 45001

ISO 14001 certifiedR2v3 certifiedISO 45001 certified

Data center removal, explained

Clearing a data hall is three jobs at once: getting the equipment out while what stays live is left untouched, making sure no data leaves unaccounted for, and recovering whatever value is left.

We run all three: every asset is tagged and serialized on the way out, drives are destroyed on site or moved by secure transport, and resellable gear then goes straight to buyback.

Scope

Sites
Colocation, hyperscale, edge
Size
Single cabinet to full site
Includes
Racks, servers, storage, network, cabling
Data
On-site or secure-transport destruction
Close-out
Reconciliation report

What data center removal includes

One crew handles the teardown and the paperwork, as well as where the hardware goes next.

Full or partial decommissions

Whether it is one cage, one hall or the whole facility, we scope it.

Removal and cleanup

Extraction, cable and pathway clearing and palletization, as well as site restoration.

Inventory and serialization

Every asset tagged and documented before it leaves the floor.

Secure data handling

On-site destruction or secure transport, so no data leaves unaccounted for.

Buyback or recycling

Equipment routed to value recovery when it can resell, or to certified recycling.

Reconciliation report

A record of what left the site, as well as where it went.

How data center removal works

  1. 1Step 01

    Site assessment

    We walk the space before work starts and scope what is coming out.

  2. 2Step 02

    Plan and schedule

    Work is then booked around your maintenance windows.

  3. 3Step 03

    Remove and pack

    Extraction, palletization and transport, fully tracked while equipment moves.

  4. 4Step 04

    Finally, reconcile and report

    You get the full record, as well as any buyback value.

A phased removal planSample six week project, two data halls
Week 1Week 2Week 3Week 4Week 5Week 6
Site walk, then asset list
Plan around your windows
Hall A removal
On-site drive destruction
Hall B removal
Reconciliation report
Night and weekend windowsRuns alongsideClose-out
Warehouse with equipment on racks after a data center removal

Data center removal for every facility type

Whether it is colocation, hyperscale or edge, we match the plan to the site.

  • Colocation: cage decoms with strict access controls
  • Hyperscale: full-floor as well as multi-hall projects
  • Edge: POP and micro-site decommissioning

Data center removal questions

Still unsure? Call us, and a person picks up instead of a phone tree.

Can you remove just part of a data center?

Yes, anything from a single cabinet to a full facility, including isolated zones and colocation cages.

Will the removal disrupt our live systems?

We work within your maintenance windows and can split the job into phases when needed.

Can drives be destroyed on site?

Yes, on-site destruction is available, or drives move by secure transport instead.

What happens to the equipment?

Resellable hardware goes through our buyback program, while the rest is recycled through R2v3 certified channels.

What documentation do we get?

Serialized tracking for every asset, as well as a reconciliation report at close-out.

Planning a data center removal? Get a free quote.

Tell us the site, the size and the timeline so we can quote it.

Talk to a real person when you call

Hours
Mon to Fri, 8am to 6pm ET
Office
14180 McCormick Dr Bldg L, Suite 7, Tampa, FL 33626, United States